Structure determines assignment strategies in diagrammatic production scheduling

Barone, Rossano and Cheng, Peter C-H (2005) Structure determines assignment strategies in diagrammatic production scheduling. In: Smart Graphics 2005, Berlin.

Full text not available from this repository.
Item Type: Conference or Workshop Item (Paper)
Schools and Departments: School of Engineering and Informatics > Informatics
Depositing User: Rossano Barone
Date Deposited: 06 Feb 2012 21:28
Last Modified: 13 Apr 2012 11:54
URI: http://sro.sussex.ac.uk/id/eprint/31351
📧 Request an update